 | |  |  |  | |  |
| The tube is placed in the lower half of the die and the upper half lowered onto
it. At the same time sealing pins are inserted into the ends of the tube. Fluid
is then pumped into the tube at high pressure (up to 3000 bar) expanding the
tube to fill the die cavity.
|
|
|  |
 |  |
|  |
|  | |  |